Aopu Yuba Installation Notes Installation Telephone

Yuba maintenance and installation process is still very important, directly related to the future use of the product, today we will introduce you to the main points and precautions of the Aupu Yuba maintenance installation process.

Pre-installation preparation

1, determine the product installation height

In order to obtain the best heating and ventilation effect, the product is installed on the ceiling above the bathtub or shower room. The shower direction should be avoided in the direction of the air outlet to prevent the warm air from blowing directly to the human body. The height of the rear cover from the ground is 2.1m-2.3. Between m, too high or too low will affect the use of effects.

2, install the ceiling

Lay the keel horizontally (the chandelier sandwich height is not less than 210mm) and install the gusset plate.

3, install the ventilation pipe

(1) open vent

Determine the location of the ventilation on the wall (the center of the ventilation hole should be about 70mm higher than the upper surface of the keel), and a 105mm round hole is opened in this position.

(2) Install the ventilation pipe

Connect one end of the 100mm ventilation pipe to the windscreen and fasten it with a hoop, then fix the window with screws. If the window is fixed on the wall, the gap between the ventilation pipe and the round hole needs to be filled with filler.

(The model of the FDP1020C has no ventilation window. One end of a 100 mm ventilation tube can be inserted into a round hole in the wall. The gap between the ventilation tube and the round hole is filled with a filler.

4, determine the product's installation location

According to the overall effect of the ceiling to determine the product installation location, leaving a corresponding position on the ceiling, the product host should be installed directly above the bathtub or shower. Aopu pays attention to after-sales service, has nearly 20 years of senior professional experience and perfect quality service network, with sincerity, patience, love, confidence, perseverance in exchange for consumer's confidence. At present, Opel has more than 300 service outlets all over the country, professional service teams, warranty repairs, regular telephone calls, and free consultation. Aopu is available online 24 hours a day, and Aupu Yuba installed a telephone.

The information about the installation of the telephone in the Aupu bathroom heater was introduced here. I hope this article will help everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.

Integrated ceiling selection tips

Top ten brands of integrated ceilings

Matters needing attention when installing integrated ceiling type Yuba

Types of gypsum board ceilings Advantages and disadvantages of gypsum board

Ceiling installation bath Yuba ten brands

High Voltage LED Strip Light

High Voltage Led Strip Light,Led Strip Light For Outdoor Decoration,Waterproof Led Strip Light,Double Row Led Strip Light

Shenzhen You&My Electronic Technology Co., Ltd , https://www.youmysolarlight.com