1, elastic line. During the home inspection, the playing line is a very important step. To ensure that the bullet line is more accurate, the workers at the B&J Peace House will use a high-tech locator to find the desired height on the wall, and then use this as a benchmark to perform the line-up. 2, do Yang angle bar. Making a corner strip at the corners is an indispensable step to ensure the absolute verticalness of the wall surface and to avoid daily collisions. 3, measuring the angle of straight. Put professional measuring instruments on the corners of the wall and check whether the angles of the yin and yang are vertical from the numbers displayed on the tool to ensure accuracy. 4, measuring wall hollowing. Many seemingly sturdy residential homes have a lot of empty walls, even at heavy walls, and there are great security risks. Therefore, the supervision of the safety homes of B&Q peace homes will undergo rigorous testing to be timely repaired before construction. 5, check the floor drain. Checking whether the floor drain is unobstructed is also an important step in the acceptance of the house. If there are any problems, the property can be promptly contacted for settlement. Otherwise, after the construction, it is difficult to determine which side the responsibility belongs to. 6, protect the entrance door. In order to prevent the entrance door from being damaged during the construction process, the workers at B&J's Relief Center will use a special door sleeve and a protective film to wrap the door and handle tightly. 7, supporting facilities. Employees at B&J Relief Center will install a tripod at each construction site to store lightweight materials. The construction schedule will be posted below the center of the tripod and the fire box will be placed at the right. 8, protect the threshold, guide rails. For the original thresholds, guide rails, etc. that are retained on site, the workers at B&J's Relief Center will use a blockboard to temporarily customize a wooden protective cover to avoid accumulation of dust and rubbish in the construction and cause damage. 9, protect the floor drain. For every sewage pipe nozzle at the site, workers at B&J's Relief Center will seal it with a special protective cover to prevent dust particles from falling into the building and plugging the pipes. Construction Crossing Residential House
Chain Link Fence can be used as fences in gardens, parks, roads, sports, industrial sites, sports field, river banks, construction and residence, also animal fencing.
Chain Link Fence Specifications:
Fence Height
Fence Length(2m)
Wire Gauge
Wire Diameter
Opening
Weight kg/piece
Fixing Pole
Weight kg/set
60
10#/8#
3.2 4
5X12
6.5
1.9
80
10#/8#
3.2 4
5X12
7.5
2.3
100
10#/8#
3.2 4
5X12
8.5
2.7
120
10#/8#
3.2 4
5X12
9
3.1
150
10#/8#
3.2 4
5X12
11
3.7
180
10#/8#
3.2 4
5X12
12.5
4.3
200
10#/8#
3.2 4
5X12
13.5
4.7
Chain Link Fence Diamond Wire Mesh, Mild Steel Wire, Stainless Steel Wire Fence Anping County ShunXing Hardware Wire Mesh Co., Ltd. , http://www.shunxing-fence.com
cm
mm
cm