Three Trees Paint Nature Floor Paint Socket Switch Wallpapers Windows Overall Kitchen Kitchen Price Glass Tiles Kitchen Cabinets Doors Kitchen Ceilings Floor Tiles Red Bricks Glass Furniture Kitchen Doors White Furniture Glass Doors Kitchen Glass Sliding Doors Kitchen Bathroom Ceilings Bathroom Tiles Bathroom Doors Bathroom Tiles Colors Toilet Door Size Bathroom Size Toilet Ceiling Material Toilet Waterproof Price Toilet Ceiling Overall Bathroom Toilet Design Toilet Waterproof Floor Tile Tile Price Kitchen Tile Gantry Type Plate Drilling Machine High Speed Drilling Machine,Flange Cnc Drilling Machine,Steel Structural Drilling Machine,Steel Flange Drilling Machine Shandong EN FIN CNC Machinery Co., Ltd , https://www.shuofangcn.com
2, select the good days auspicious days, put the artillery to start before the workers enter the market, it is best to personally measured the corner corner of the home again, take a pencil rule down, marked clearly. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area; clear main wall size. In particular, it is necessary to design the wall size of the furniture later.
3, the main demolition reform, so that the space is more practical The main demolition reform is the first on a project, including the demolition of walls, walls, spade wall, demolition of heating, change steel windows and so on. After the demolition of the completed garbage, it must be cleared up in time to ensure the cleanliness of the interior, but also to facilitate the construction. At this point, the finished door should be set. At this time, it is best to walk through the cabinets, range hoods, stoves, and water heaters, and try to be sure.
4, hydropower reform, arrange the use of each space is the most important part of hydropower reform, we must determine the exact switch, lamps, basins, bathtubs, washing machines and so on the exact location. Before the hydropower reform, the cabinet designer should come to the door to make the first measurement and help you determine the power and waterway reconstruction plan. Water heaters, it is also best to send people to design the power, the location of the water inlet and outlet according to your model. Reminder: On the wall below the basin, it is best to leave the power outlet for easy loading. The air-conditioning hole and power source should be placed on the wall of the bedside as much as possible to avoid air-conditioning blowing directly to people. Strong electricity and weak points must maintain a 20-centimeter gap. For example, a distance of 20 cm must be left between the outlet and the cable.
5. Pack up the tubes and wrap the unpleasant pipes in consideration of the moisture-susceptible environment of the kitchens and toilets. The material of the standpipes must not be wood keels! Even wooden keel brush anti-corrosion coatings will not work. Packing tube with light steel keel, or red brick. Light steel keel provinces, but the most solid and easy to use is the red brick. At this time you need to buy a good tile, caulking agent and so on. The furniture should be set early and the good duration should be kept. It takes at least 15 days or so. Generally, it takes more than one month. Reminder: The package pipe must not wrap the place where there is an inspection opening, and cannot find any reason for seepage.
6, tiling, the first thing has a solid texture before the tiling, to buy a good floor drain. Reminder: floor drains are going to local hypermarkets to buy. To buy a dedicated washing machine or shower floor drain, but also to have deodorant function. After finishing waterproofing and pulling hair, prepare a tiling. The normal tiles pay attention to the water and dry before the tiles are attached; the broken tiles are left for cutting. Reserve allowance before buying bricks. At this time, basins and faucets should be determined, and cabinet designers should be invited to visit the house for the second time. At the same time, they should purchase paint (mixed or clear), wall paint, lacquer, diluted water, etc., as well as wallpapers.
7, oil workers go into battle, scrub brush scrub brush wall leveling, grinding, rolling brush, the effect is good, absolutely rely on painter's craft. The good adhesion of the primer can make the wall more smooth, making the topcoat easier to apply and reducing the amount of topcoat used. Moreover, the excellent sealability of the primer makes it effectively resistant to the penetration of alkaline substances in the wall, preventing the precipitation of water-soluble salts and preventing the return of alkali to the walls. Reminder: If the walls are to be painted, the color must be noticed. The color to be extracted is lighter than the color card. Don't be the same as the color card or deeper than it is because at least two coats of paint are used to paint the wall, and some are still three. Over and over, the color of the wall will be deeper than the one layer. The method of painting is spraying or roller coating. The benevolent sees the person and the wise sees the wisdom. The effect of the spray is better, but once it is destroyed, it will become difficult.
If you do not buy finished products, let the worker master do it. Reminder: Any carpentry, even if it is only a mouthwash, must follow this step, big core sinking, veneer veneer, and then paint. When mixing oil, it is absolutely wrong to brush the oil directly on the big core board. Brushing oil directly, it will not be long before it will crack. Now do oil mixing, no brush, but spray. It is best to let workers spray white on the inside of the door and the meter box.
8, wallpaper, beautiful wall paint after the brush is good, the oil traders need to paste the wallpaper where the nitro lacquer, paint can be dry the next day, and then you can paste the wallpaper about the master. Reminder: Do not open the window for ventilation within 48 hours after the wallpaper has been posted. Let it dry slowly. Say good to the master, if there is an odd place in individual places, trouble him to repair it. At this point, the purchase of panels, sockets, lamps.
9, install the socket panel socket panel about half a day can be installed. Sockets are best bought with a switch function, especially the kitchen, so rice cookers, microwave ovens can avoid plugging and unplugging the power supply, and can be controlled with a switch. The switch socket is good, but pay attention to practicality. Five-hole power with switch, three sockets are flat mouth, once your electrical needs is a round mouth three items, there will be a depressed situation with empty plug socket. Therefore, the multi-use socket must also be, even if it does not switch control! At this time, you should purchase the ceiling used in the bathroom kitchen, if you need to install Yuba, please buy and install before the ceiling.
10, kitchen and toilet ceiling, seal the last ugly part of the first installation of water heaters and Yuba, after installation, the ceiling edge can be better half-package water heater, which is more beautiful convergence. It is advisable to buy ceilings from aluminium gussets. Even if they are removed after many years, selling scrap aluminum is worth a lot of money. The pvc buckles look good, but the quality and performance are generally the same. Buy buckle board, to ask the price of all-inclusive, do not buckle board, corner to buy. But the installation fee is another calculation.
11, install the cabinets, beautiful whole kitchen cabinet is born with a project, should be expected in advance hood, stove and sink. It is best to send it on the same day and install it together with the cabinet. We told the cabinet factory in advance that we would bring the artificial stone countertops with the cut-off appliances and the sinks together.
12. Finished product door installation Finished doors should be installed before the floor, mainly because of complex door installation procedures, hinges, door locks, door stoppers, door frames, etc. There are many tools used, such as installing the floor first, and the bumping is difficult to avoid.
13. Install drying racks, curtain rods, lighting fixtures, sanitary ware, and bathroom hardware. It is recommended that before the installation of the floor, all the items that are scattered in the ash are handled one by one.
14, before installing the floor to install the floor must be leveling, prepared in advance with a little pepper used as insecticide powder, so that floor workers to sprinkle along the kick angle on the line. For the sake of tidyness it is better to ask workers not to cut the floor in the house.
15, land reclamation cleaning is the first glass. Followed by waxing the floor, wax to buy their own, cheap and easy to use, but must use a cleaning waxing machine, efficiency is faster than artificial one hundred times faster. Buy a pack of "five clean powder", use an old towel, stained with dry powdered five clean powder, wipe from the mouth to the door, from the tiles to the corners, and one house and one house.
The master of decoration is such a practice! Learning "15 dragon palm" to deal with JS
1. When the tools are in place and ready for renovation, several things must be prepared and placed in your bag. Tape measure (5m), calculator, large plate clips (folder list, receipts). In addition, it is best to prepare old towels (soft cotton, rubbed bricks), plastic bags (wrapped in Pipe interface, can prevent dirt blockage.