When accepting hydropower, pay attention to which hydropower inspection is

With the high tide of buying a house, decoration is in full swing. If you are the owner of the decoration for the first time, you must first have a concept: "hydropower must be done." Hydro is a secret project. It is very difficult to repair in the later period. It is not allowed to sloppy and cut corners. So, what should we pay attention to when accepting hydropower ? Xiao Bian listened to the experience of many masters, and wanted to pay attention to what should be paid attention to when sharing water and electricity . Let's take a look!

First, what should pay attention to when checking water and electricity

1. Hydropower acceptance process

The acceptance of water and electricity as its name suggests is the acceptance of water and electricity. The main direction of water acceptance is pressure testing and pressure relief, and leak detection. The acceptance of electricity depends on the line, leakage and so on.

2, material acceptance

The inspection of materials mainly depends on the brand and quality. The quality of plumbing is technically standard, and it can be considered as a qualified product if it reaches the standard. After the quality is passed, it is necessary to see if it is suitable for use here, and the price should be consistent with the budget table.

3, the arrangement of water and electricity pipes

First of all, the layout of water and electricity pipes should be neat, and the junction between strong electricity and weak spots must be well-shielded. The layout of hydropower pipelines is horizontal and vertical, and the weak points and strong currents need to be separated by different colored pipes, and the distance between them is more than 30cm. When doing the shielding process, we recommend that you wrap it with foil to protect the crossover tube, so as to avoid signal interference and reduce wear.

4, water pipe installation

The water pipe side alone talks about: There is an unwritten rule in the installation of water and electricity, that is to go to the top not to go; the top can not walk away the wall, the wall can not walk before leaving. We can summarize the three ways in which water and electricity can be piped: walking the wall, walking the roof, and walking the ground. All three have their own advantages and are difficult to deal with. However, considering comprehensively, go top> go wall> go!

It is suggested that everyone can walk to the top and leaks can be detected in a timely manner to reduce the friction with neighbors downstairs. When the kitchen and the bathroom are at the top, it is very good to avoid the moisture in the underground and wall lines.

5, pressure test

Pipe pressure test is a very important step. During the entire pressure test process, the good pipe has no leakage during the test, the water flow is smooth, there is no clogging, and the water meter is running normally. To give you a reference value: When testing, keep more than 0.85Mps (about 8.5 kg), 30 minutes no seepage, water pressure does not drop more than 0.05Mpa.

6, line detection

The first step in line inspection is to look at the shunting of electricity, because household appliances can be quite a few. For example, air conditioners, water heaters, and lighting all require a separate circuit, and the line corresponds to the power of the relevant device, so that the flea situation does not occur in the future.

The article concludes: The above is the full content of what should be paid attention to when accepting hydropower . Hidden projects like hydropower acceptance must not be sloppy. If something goes wrong, it will take a lot of money and costs to remedy the situation in the future. Therefore, it is recommended that everyone would rather be the best and do not cut corners!