Wooden doors are an important expense in the decoration. Many consumers are very careful when choosing the material and style of the wooden door, but they don't know much about the installation. In fact, the wooden door is a semi-finished product, and the later installation is also very important. The correct installation can guarantee the long-term use of the wooden door. Today, we ask experts to talk about how the owner should check the wooden doors and the details that need to be paid attention to during installation. Get ready for receiving wooden doors According to experts, in terms of process, the installation of wooden doors should be carried out after the completion of the construction of the ground and the wall, that is, after the floor is finished with the tiles, the floor and the wall is painted. If the wall on which the wooden door is installed is a new cement wall, it must be ensured that the water inside is fully evaporated (10-15 days) to prevent the water vapor from eroding the door cover and causing deformation. Autumn is the peak season for decoration. The owner should arrange the installation time with the wooden door merchant at least one week in advance to avoid the delay of the merchant's flight schedule. In addition, it must be about the first installation in the morning of the day, so that the working state of the workers is the best, if not the first one would rather be wrong one day later. It takes about 40 minutes to an hour to install a wooden door, plus the delivery time. If it is 4 doors, it will probably be installed in the afternoon. Therefore, the owner needs to take a day off to supervise the construction of the workers at any time. How to accept after delivery The wooden door belongs to the customized product. Once the installation is completed, it is more troublesome to find the problem and then change it. Therefore, after the wooden door is delivered, the owner must carefully check the acceptance. Inspection process: 1. Check the surface of the door for scratches, bumps and other injuries; 2. Check if the color is consistent with the sample, and whether there is obvious color difference; 3. Check whether the double-sided color of the wooden door is consistent, and whether there is any significant difference; 4. Check whether the color of the whole batch of door and door cover is consistent, and whether there is obvious color difference; 5. Check whether the surface is bright and the wood grain is clear; 6, whether the surface of the paint has sag, shrinkage, rising edge, wrinkled skin; 7. Whether the line corner is basically the same as the surface, no accumulation of paint, abrasion, etc.; 8. The wooden door should be flat, square and without warping; 9. Whether the product components and components are tightly combined and firm; 10. Check whether the hinge, door lock, handle, and door suction are the predetermined brands and models. Supervision of the installation process Before installation, spread the unpacked box to the floor and place the door fan horizontally on it. Do not lean against it to avoid deformation. Door cover installation 1. The door set should be tightly connected, flat and without black seams; the fixed parts should be locked; the diagonal of the door cover should be accurate, the tolerance is less than 1 mm within 2 meters, and ≤ 1.5 mm for more than 2 meters. 2. After the door is set, it should be three-dimensional horizontal and vertical, the tolerance of verticality is +2 mm, and the horizontal straightness tolerance is +1 mm; the fixing between the door cover and the wall should be fixed screws (no less than 3 per length) ); the width of the door cover should be more than 200 mm; a fixed iron piece should be installed; the gap between the door cover and the wall should be sealed with foaming rubber on both sides, the styrofoam should be evenly spread, and then dried and cut flat. Nanjing Great Century Art Model Co., Ltd. , , https://www.dsjysmx.com