Floor paint construction plan introduction floor paint construction precautions


My friends learned how the floor paint was made before we renovated the home network. Now we will continue to understand what our floor paint construction plan is. Let’s talk about the floor paint construction plan. What are the characteristics and use of our floor paint? Let's take a look at what our floor paint construction plans are and what the precautions for the floor paint construction plan are.


地坪漆施工方案


First, the floor paint introduction


1, beautiful


Since the launch of the epoxy floor, it has always been a flat, bright as a selling point, all kinds of crafts, all varieties have everything, not to mention the color, not only colorful, but also because of the use of color sand, the color does not fade According to the owner's hobby, it fully embodies the humanization and harmony, especially its tough and clean surface. The orange peel pattern is flat and even, it is non-slip and easy to clean, and when the owner wants to replace the new floor, It is easy to renovate and renovate. People are gradually introducing industrial flooring into homes and public social places, and developing the design of epoxy floor as an art.


2, true


Epoxy floor has entered China for more than ten years, and the laying area has been too large to calculate. Epoxy floor, all materials, quality, quantity, ratio, clear and strict, no falsehood, construction process standards and standards, can not be sloppy, the builders have a little care, the owners can immediately reflect. Because the epoxy floor fully reflects the authenticity of the materials, people use the materials real, the cost is clear, and the price becomes more rational.


3. Humanization


The epoxy floor is not only clear in materials, but also true in price. The trust between the owner and the constructor is easier to establish. The construction process is very strict, the process is clear, but it is very simple. The product design is fully reflected. The construction plan that the user thinks is very user-friendly. Epoxy floor products have achieved the perfect combination of industry and art, and the appearance, wear resistance, water resistance and anti-corrosion properties far exceed the wood floor.


Second, the floor paint construction plan process


1. Newly poured concrete floor: The concrete is mainly composed of cement, sand, stone, plaster, etc. It has large water absorption, strong alkalinity and slow drying. The surface effluent and water absorption of newly poured concrete are the key factors affecting the quality of the coating. Therefore, it should be dried for a long time before painting. Unless it is specially reduced, it is generally required to dry more than 28D, and the moisture content of the base surface is less than 6%. The surface efflorescence should be thoroughly removed and neutralized if necessary. Concrete strength requirements are above C25. The ground level is checked with a 2m ruler and the gap must not exceed 3mm.


2, the old ground: the old ground has been used, the damaged parts should be found. If there are wax layers, oil contamination, chemically corrosive media and old coatings, they should be treated accordingly.


3, floor paint points: the self-leveling performance mentioned in the floor paint mainly refers to the top coat, the primer and the middle coat are the same as other floor types. Self-flowing flat paint is the key to determining the apparent effect and effect of epoxy self-leveling floor. Construction of epoxy self-flowing flat paint, mainly in the form of scraping.


4. Gently drive the self-flowing flat paint through the toothed side of the file to create a little power, and then let the self-flowing flat paint level itself. During construction, temperature, construction methods and construction techniques directly affect the effect of epoxy self-leveling floor.


实木地板好吗


Third, the floor paint construction precautions


1. The construction temperature is ≥5°C. If it is to be constructed at <5°C, special formula is selected. Humidity is recommended to be applied below 75%.


2. Ensure air circulation during construction. When using the amount of modulation, it should not exceed 30 minutes.


3, the construction process to do a good job of maintenance, to avoid the intrusion of dust and debris, affecting the paint surface effect.


4. After the construction is completed, it must be maintained for at least 7 days before it can be put into use. During the curing period, there is especially no infiltration of water or various solutions.


5. It is strictly forbidden to mix in other paints.


6. The curing agent must be added in strict accordance with the specified ratio.


7. Keep the surface of the object to be cleaned. The moisture content of the object to be coated must be less than 7%.


8. Keep the painting environment clean and it is strictly forbidden to work in an environment with a lot of dust.


Some steps in the floor paint construction program have already got a detailed understanding from the article, so what kind of precautions should be paid about the floor paint construction plan mentioned by this small series? Our friends should pay more attention to it later, our Xiaobian will continue to introduce more decorative information in the decoration home network for everyone, thank you for reading.


More related wonderful reading:

Resin epoxy floor paint type resin epoxy floor paint process

What is the price of epoxy floor paint? Epoxy floor paint construction process

How to build floor paint? Floor paint construction process

What is polyurethane floor paint? The price of polyurethane floor paint

What is floor paint? What are the types of floor paint?

Huijie Steel Pipe Manufacturing high precision CDW/CDS/Dom Steel Tubing for wide application in the automotive industry,for Shock absorber,tranmission shaft,steering gear,gas spring,rubber bush inner and outer tubes,hydraulic line pipes,etc

Size: O.D. 6--108mm, W.T. 0.8-12mm

Production standard: GB/T 3639, Astm A519/A513, DIN 2391, DIN2391/C, EN 10305-1, EN 10305-4.

GOST9567 JIS G3445/G3446,BS6323 etc.

Normal Material: 10#.20#.35#.45#.4130.4140.ST30Al.ST35.ST45.ST52.E215.E235.E355 STKM11,12,13,14.

Delivery heat-treatment Status:

a) Cold drawn/ hard: (+C).   b) Cold drawn/ soft:( +LC).  c) Cold drawn and stress released: (+SR).

d) Annealed:( +A).  e) Normalized: (+N).

Automotive Steel Tubes

Astm A519,Astm Steel Tubes,Automotive Steel Tubes,Seamless Precision Automotive Tubes

Ningbo Huijie Steel Pipe Manufacturing Co.,Ltd , https://www.hjbearingtube.com