There are many advantages of floor heating. This is why we like to choose floor heating. If our home is warm, the indoor surface temperature will be even, and the room temperature will gradually decrease from bottom to top, giving people a good feeling of cold feet. It is not easy to cause pollution. Air convection, indoor air is clean; improve blood circulation and promote metabolism. Then someone will ask, what is the price of geothermal installation ? Can we accept it, and how to install geothermal heat, is it complicated? Then let Xiaobian answer it for everyone. First, the geothermal installation price introduction 1, warm installation costs, floor heating installation price mainly depends on the heating materials, laying power per square meter and the temperature controller, the auxiliary materials as long as the floor heating is almost the same. At present, the installation price per square meter of power-on floor heating is 150-350, mainly due to the different prices of heating materials - heating cable, carbon crystal floor heating, carbon fiber electric floor heating, and electric heating film. 2, warm installation costs, floor heating installation quotation calculation is more complicated than electric floor heating, generally the price of water floor heating pipe per square meter is about 100 yuan, if you count gas boilers, sub-catchments, thermostats and other related Accessories, auxiliary materials, water floor heating price per square meter is about 180-320 yuan, the price is equivalent to electric floor heating. Second, geothermal installation steps 1. Install the manifold to assemble the assembled manifold according to the position and elevation determined in advance according to the actual situation of the user's home. It is firmly and firmly attached to the wall and fixed with expansion bolts. In order to prevent heat loss, it is necessary to put a special insulation sleeve for the pipe from the water collector to the installation room. Connect the jacketed pipe to the sub-catch and connect one end of the pipe to its temperature-controlled valve. After the pipe is laid, the head of the pipe is transferred back to the manifold to be fixed. 2. Before leveling the floor heating, begin to clean the floor in the room to ensure the leveling of the floor and eliminate the bumps and debris on the ground. Then, it is necessary to conduct a field inspection of the entire home to determine the installation location of the fireplace and the sub-catch. 3, the main water pipe to install the main water pipe must use hot water pipe, you can use PP-R or aluminum plastic pipe, strictly install the design drawings, the installation is straight and tidy. 4. Install the temperature control line to slot the place where the manifold is installed, bury the temperature control line, and place the relevant temperature control line around it for connection. 5, laying insulation layer insulation board laying should be smooth, cut neatly, the joint joints should be tight, the whole board is placed around, the cutting board is placed in the middle, the flatness of the insulation board should be paid attention to when laying, the height difference is not allowed to exceed positive and negative 5MM, the gap is not more than 5MM. 6, laying reflective film reflective film laying must be flat, no wrinkles. The cover is tight and there must be no leakage of insulation board or ground. The reflective film is symmetrical and neat, and no misalignment occurs. The reflective film must be pasted with transparent tape or aluminum foil tape. High quality reflective film and standard paving reflect 99% of the heat. 7. The floor heating pipe for laying the floor heating pipe shall be laid according to the pipe spacing and orientation calibrated according to the design drawing. It shall be kept straight, and the pipe material shall be fixed on the extrusion board with a plastic staple according to the drawings or fixed on the steel wire mesh with a strap. When the installation is interrupted or completed, the opening should be blocked at any time. For the heating of the floor heating pipe, special tools should be used; the incision should be flat, and the fracture surface should be perpendicular to the pipe axis. 8. After the pipeline water pressure test is installed, the water pressure test should be carried out. Firstly, the pipeline should be flushed and purged by water to ensure that there is no foreign matter in the pipeline. Then, the water is injected from the water injection and exhaust valve, and the test pressure is 1.5 to 2 times of the working pressure, but not less than 0.6 Mpa. The pressure drop within 1 hour of the voltage regulation is not more than 0.05 Mpa, and the leakage is not acceptable. 9. When backfilling the leveling ground, all the concrete filled with fine stone concrete should be compacted by manual pressing. The horizontal line of the whole house must be at a height, and no exposed wire mesh should appear. When laying concrete, marks must be made at the doorway, aisle, floor drain, etc. to prevent the improper behavior in the later construction from damaging the floor heating pipe. 10. Install the wall-hung boiler according to the size of the wall-hung boiler, and reserve the size before the installation, the position of the flue, and calibrate the correct position before installing the wall-hung boiler. The bottom interface of the wall-hung boiler is connected by a hose. The above-mentioned Xiaobian introduces the geothermal installation price and steps for everyone, and makes a reference for friends who want to install geothermal. If you want to know more about geothermal problems, please continue to pay attention to the decoration home network. Vanity Lights,Glass Vanity Light,Indoor Solar Lights,Stair Lights Indoor Foshan Nanhai Pinming Electrical Appliance Co.,Ltd , https://www.mavcadonf.com