Beware of the best time for decoration quality problems

Nowadays, there are more and more well-decorated commercial houses. Although there is less labor to worry about in the building materials market to buy and decorate the house, the disputes caused by the quality of the decoration room also occur from time to time. In particular, when you choose to set up a lucky day to move to your new home after you have repossessed your house, you will face a series of decoration quality problems when you repossess your house. When the project is reworked and rectified is no longer in sight, distress and inconvenience will follow. Therefore, to learn decoration knowledge, in the construction phase before the resumption of the building involved in the acceptance of the project, you can take preventive measures.
Keli Yung cabinets Qianghui tiles

â—† Acceptance of decoration

1, the acceptance of the water circuit. The owner can check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is normal, and reconfirm the actual size of the line transformation under the operation of a professional hydraulic or electrician. Only after the line is changed, can the ash inlay workers seal the wall and putty.

2, the woodwork size acceptance. After the carpentry foundation has been completed, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are also well-attached, while the painted wall should be scraped twice. Acceptance work at this stage is very important, the owner should carefully check the drawings, confirm the size of the various parts, if found inconsistent place, promptly prompt the construction team to modify.

3, wood quality inspection. When all the veneer panels of wood products are well-attached and the wooden thread is nailed, the owner can accept the woodwork quality. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.

â—†Special acceptance "hidden project"

During the construction process sequence, the work of the previous process has been completed and will be overshadowed by the next one. The part that cannot be inspected is called the “hidden project”. At present, a large part of the quality problems in home decoration is caused by the improper construction of “hidden projects”.

1, due to the collapse of the roof as a whole or in part, so that the ceiling becomes "falling." This is mainly due to the ceiling and floor, and the keel and veneer combination is not good, or caused by excessive load. According to the regulations, the ceiling keel shall not be twisted or deformed. The installed keel shall be firm and reliable. The horizontal deviation shall not exceed 5 mm. A chandelier or ceiling fan weighing more than 3 kilograms cannot be hung on the ceiling keel. Instead, a hook should be provided. If the ceiling uses gypsum board as veneer, its thickness should be about 9 mm.

2, the balcony package is not fixed due to slump. Due to the current housing design, there is no “settling point” for the packaging material on the balcony, which makes it difficult for the balcony to be packaged. Therefore, when the balcony is packaged, the doors and windows must be horizontally and vertically aligned with the same height and appearance without distortion, open welding, and fracture. The gap between the frame and the wall should be full and dense.

3, pipe leakage caused damage to the roof. The upper and lower water pipes in kitchens and bathrooms are prone to problems. Because the installation of pipes is not easy to check, after all the pipes are completed, they must be checked for water injection and pressure, and no run, run, drip, or leak will be considered.

4, buried lines do not pass. At present, many residential buildings use buried lines, so it is not easy for owners to inspect construction quality. According to regulations, buried lines cannot be buried directly in the plastering layer but must be sheathed outside the wires. Wires in the bushing must not be twisted or jointed. In addition, when installing the line, we must strictly abide by the "fire line into the switch, the zero line into the lamp", "left zero right fire, grounding in the" provisions. After the completion of the construction, in addition to power inspection, the construction team shall also provide the owner with a detailed circuit configuration drawing.

â—† Acceptance after completion

After the completion of wood products, the painter can start the primer treatment work, and all the floor tiles should also be posted within this phase. This is the fifth phase of the phased acceptance. The content of acceptance at this stage is the most comprehensive and thorough. The owner accepted the project and the standard was the decoration contract, the construction drawing signed by the owner, and the relevant documents of the relevant state department on the quality inspection of the decoration project. The acceptance was mainly from the following aspects:

1. Power lines: The circuit shall be laid in conformity with construction regulations and safety standards. The socket shall not be less than 30 centimeters from the ground. The three-wire socket shall be grounded. The kitchen and air-conditioning lines shall be laid in dedicated lines. The main gate shall be equipped with a leakage prevention switch and the lamps shall be firmly installed.

2. Water supply and drainage facilities: There is no leakage of the water supply pipe, the switch valve operates well, and the drainage is smooth without leakage or water accumulation.

3. Floor: The floor tiles are flat, with clear texture and uniform color. The cross line is horizontal and vertical. The floor is laid smoothly, and the joints are even and straight. The paint has the same color and no scratches.

4, the wall: wallpaper paste firmly, tight seams, complete pattern, pattern fit, edge seam neat without edges, uniform coating, no bump, no color, no dust.

5, doors and windows: switch freely, the door frame, window frame and glass around the seal well.

6, paint: paint is smooth, feel good, enough oil, no nails, sweep marks, burrs and color.

The acceptance stage is not absolute in the actual construction. Different families have different requirements for the decoration content, and the construction progress will naturally have corresponding adjustments. The owner can flexibly grasp the progress of the project. Experts also put forward five suggestions for consumers who buy refined decoration rooms: First, they must pay attention to common problems such as leaks and cracks. The solution is to see if the kitchen and bathroom are waterproof and whether there is any test; The interface parts, especially some concealed works buried in the decoration, take a long time. These joints, interface parts or buried parts are prone to problems. Third, we must pay attention to check whether the commonly used components are qualified, such as hardware; To determine a good brand, to prevent "fake brand"; Fifth, we must ask the developer instructions for decoration, in order to understand the burial project and the use of methods.

1. Circuit: Should pay attention to whether the power switch is changed, whether the circuit capacity is enough to load the electrical equipment, whether the power panel on the wall is enough, whether the position is reasonable, and whether the power supply of the kitchen and the toilet is safe.

2, stainless steel wash basin: connect it to the mouth of the water, it should be kept cool, the user can use their hands to touch the surface of the hose if there is water seepage. Many pots and benches are decorated with granite or marble, and they should feel uneven or scratched marks on the countertops. The trimming of the corners should be neat.

3, cabinets: switch cabinet doors to see if it is smooth, and check the stability of its installation, in particular, should pay attention to whether the phenomenon of Screws off.

4, tiles: wall feet or more hidden corners are generally easy to ignore, decoration workers are often lazy. Between the foot of the wall and the foot of the cabinet, if there is a gap, it is easy to kill the rodent.

5, the door: to operate freely. In addition to paying attention to whether the door trim is smooth or not, try to unlock the door and see if it works well. If the door gap is too large and too easy to open, or if the gap between the iron bars of the security door is too wide, the anti-theft function cannot be used, and whether the door key and the door lock are sealed or not.

6, window: the most afraid of seepage. The most frequently encountered and most troublesome in the inspection of the house is the water seepage problem. Therefore, it is necessary to check whether the seesaw, the ceiling, the wall and the bathtub have water seepage. The method is to spray water on the outside wall for more than 10 minutes, and then see if there will be water stains on the window sill (dark print).

7. Floor: Echoes or not. Look at whether each floor is symmetrical and vertical. It is also a common disease. If the floor is hollow, knock it by hand or use foot pedals to hear whether the sound is empty and there is an echo. If it is, you may know that the floor may have problems; laying the floor trimming Can not be ignored, especially in the corner and near the door, should pay more attention.

8, baseboard: Mainly to see whether the wood strip interface is smooth, whether uneven, whether trimming interface trim.

â—† refined decoration room also has a warranty period

General Secretary Sun of Nanjing Decoration Industry Association stated that once the owner has had problems in the renovation of the house after check-in, he must first figure out the minimum warranty period for the residential interior decoration (the warranty period for residential interior decoration refers to the calculation from the date of acceptance of the completion of the completion). Under normal conditions of use, the minimum warranty period for architectural decoration works is: 1. Waterproof toilets, rooms and external walls are leakproof for 5 years; 2. Heating and cooling systems are 2 Heating period, cooling period (2 years); 3, electrical pipelines, water supply and drainage pipelines, equipment installation and Other projects, for 2 years.

Links: Treatment of Different Wall Base Layers During Wallpaper Construction
The acceptance problem is comprehensive and the case site teaches you two hands

Construction Acceptance Entrance Decoration Children's Room Decoration Switch Window Paint Residential Room Glass Brick Cabinet Door Ceiling Fan Lamp Art Glass Household Cabinet Stainless Steel Cabinet Glass Door Kitchen Cabinet Door Floor Tile Glass Door Cabinet Door Kitchen Glass Sliding Door Bathroom Tile Bathroom Door Toilet Ceiling Material Bathroom Door Size Toilet Size Toilet Ceiling Overall Bathroom Toilet Design Toilet Waterproof Bathroom Tile Bathroom Leakage Exterior Wall Tile Floor Tile Kitchen Tile Balcony Tile ld Tile

Spherical Washer

Spherical Washer Set,Self Aligning Spherical Washer,Spherical Washer Dimensions,Spherical Washer Standard

Kunshan Zhonggu Precision Hardware Co., Ltd. , https://www.zgfastener.com