How should the hydropower reform project be closed? The hidden project must be made into a safety worker...

Hydro-electricity reconstruction is a hidden project. Once a problem arises, it will cause great losses. It is one of the items that the owner needs to pay attention to during the renovation process. Regardless of whether to choose a decoration company or a hydropower company to carry out hydropower reforms, the owners themselves need to strictly control.
1. Material check

The first thing to look for is whether the regular products of the regular manufacturers must also be able to find the official website on the Internet. The PP-R pipes that are more common in waterways now have more brands, and it is more difficult for owners to select them during the renovation period. In this case, it is best to visit large building materials supermarkets to see what those brand specifications are. General PPR pipe is divided according to pressure rating, mainly the following: 1.25MPA, 1.6MPA is a cold water pipe, 2.0MPA, 2.5MPA is a hot water pipe, different pressure levels, the water pipe wall thickness is not the same. Of course, the higher the pressure level, the thicker the pipe wall thickness the better the quality of the pipe.

Moreover, it is the PVC line pipe of the circuit, first is to see if it is not flame-retardant, and the other is to look at the smoothness of the appearance, and finally the important thing is to look at the thickness of the pipe wall, because the cement sand will come into play after the circuit is laid. The line tube will be damaged during handling. If you do not understand it, it is better to compare several samples. Wires are more complex, and there are many brand names for strong and weak electric power. Some require a professional micrometer to get the card out. The main difference is to look at the appearance of the brand and the wire. Here, we suggest that the owners go to the regular market to buy, rather than blindly map the cheap.

Moreover, the owner must let the construction company specify various materials brands, models, specifications, wall thickness, etc. in detail before the construction contract is signed. The more detailed the better, do not allow them to make verbal commitments, all promises must be implemented in the text above. .


There is also a little trick to distinguish materials for the owner to refer to, that is, to take a few samples that you think are good on other construction sites, and to compare them with other price points at the time of purchase.

2, design checks

Before the decoration, the owner must have a general idea of ​​his own home. It is necessary to figure out which cabinet to put in, and which discharger to use, so it is very important for hydropower reform.

During the design process, the hydropower company or the decoration company will make various suggestions to you, such as whether there are dual controls in general, which is more convenient to add a socket, and where the lights are moved to is more convenient. But in the end, the owners have to take the idea, because each owner's lifestyle is not the same, it is not necessarily appropriate for others to come to you, so design must be fully considered.

When it comes to design, the owner is required to understand the electrical appliances or furniture required by the interior before starting work. Here are some important things to be aware of:

1) Using a bathtub or a bathroom cabinet, the size is large and can be put down. This has an effect on the location of the upper and lower water or the outlet;
2) Whether to use a shower room , whether it is a simple shower screen or a closed shower room, whether there is a base, whether there is a floor drain nearby, and where the outlet is;
3) The shower outlet is usually left hot and right cold, the spacing is 15CM, now generally buy more bracket shower mixers, higher requirements for the outlet, we must first ensure that the outlet is on the same level, but also to ensure that the two outlets At the same level. Also check the concrete dimensions of the bricks to avoid leaving the outlet on the waistline. In addition, due to the difference in height, each owner sometimes makes different demands on the specific height of the shower. For example, there are elderly people in the family, and on the stool when taking a bath, the shower will have to stay lower.
4) Whether to move the floor drain or increase the floor drain, remember to move the floor drain to raise the ground. If you want to use the deep water seal floor drain, the floor should be raised at least 10cm or more. You can use the partial or all raised floor method. In addition, it is best not to add a washing machine floor drain to the floor drain. There will be backwatering. If it is the basin water displacement or increase will not involve this problem.
5) Whether the toilet is displaced or not, the toilet shifter generally uses a shifter, but it can only move about 10CM, and it is also easy to block. If it does not move, it can be considered to move the toilet from the downstairs to the toilet. There is also the option of hanging toilets.
6) Whether the basin, bathroom cabinet, and toilet are wall-mounted, if it is necessary to change the water into wall-type.
7) Whether the bathroom heater warms or warms, whether it has an exhaust fan. Generally, about 5 wires are warmed up and the air is warm, and each is different. Generally, 3-8 wires are used. The style function is not the same, it determines the number of different wiring, and asks the merchant in advance.
8) Whether the washing machine needs hot water, some clothes need to be washed with warm water, so the hot and cold water outlets should be left when changing the water.
9) Whether the toilet is smart or not, the smart toilet needs to be connected to a water pipe (drinking water pipe) and a power outlet.
10) Whether a water heater is used for electricity or gas, how many liter, half or pack type is used. The outlet of a general electric water heater is 10cm, and the outlet of a gas water heater is between 10-25cm. What kind of model is this? There is a general outlet that is left-hot and right-cooled, but Wanjiale has a left-right-right heat. Gas water heater. Be sure to confirm clearly before construction. If the kitchen cabinet uses a small kitchen treasure, leave the power outlet.
11) Whether to use instant electric water heaters (baths) or electric ovens, how much power, generally have separate leads, and if the old house, the meter is 20A, can not use such high-power appliances.
12) The height of the switch is mainly convenience. This depends on the needs of the owner. The height determines the demand. If the owner does not require it, it is generally based on the height of the original developer.
13) The hood is European, Chinese or side suction, which is not the same for the socket.
14) Whether there is a water softener, a pure water machine, a water purifier, a small kitchen treasure, a garbage disposal device, etc., and a corresponding waterway and a corresponding power supply.
15) Whether there is a mirror headlight, the height and the size of the mirror should also be taken into account.
16) Whether there is a bedside lamp or not, consider the size of the bed.
17) Whether the TV is wall-mounted depends on the height of the bed or sofa and the owner to determine a reasonable height.

Suggestion: Design the whole course, it is best to take a small book to record, sum up and compare, find the most suitable for their own program.

III. Construction check

The materials entering the industry mainly verify the materials and ensure the quality of the products. In addition, the construction personnel must carry out certificate acceptance. The plumbers must hold the certificates and confirm their correctness. It is best to further implement the project and construction personnel.

Fourth, acceptance checks

After the completion of hydropower construction, acceptance of the construction details is required:
1) The water reform is best to take the top, horizontal and vertical, and use pipe clamps for orderly fixing. To suppress, 30 minutes, 0. 8MPA
2) The electrical leads must be located near the lead to ensure that they are live lines. The line tube and the cassette must be connected with a lock, and the direct connection to the tube is to be glued. The distance between strong and weak wires is preferably more than 30 cm (special handling). Line tube should be fixed with tube card. The cassette should be in the same horizontal position.
3) The hydropower line cannot go in the same tank.
4) Electrical reforms are to be subjected to power-on tests at the time of acceptance.
5) An electronic version of the circuit diagram is required for the completion of the water circuit construction.
6) Re-inspect all required construction projects to see if there are any missing items and forget to do so.


Finally, to remind the owners that regardless of who chooses to carry out the construction of hydropower, the owner must focus on checking, because the house is our owner, and only you know best about yourself and what you need most. If missing items are missing, refixing after tiling will bring some loss.

Entrance decoration lamp brand toilet decoration design socket electrical gas water heater decoration find decoration company okay function sofa bed cloth sofa cabinet function sofa mirror headlight

There is a limited number of on-site group buying activities. Register now

Related Reading
★★★Professional hydropower and everyone talk about how hydropower reform projects should be closed ★★★★

Hydro-electricity reconstruction is a hidden project. Once a problem arises, it will cause great losses. It is one of the items that the owner needs to pay attention to during the renovation process. Regardless of whether to choose a decoration company or a hydropower company to carry out hydropower reforms, the owners themselves need to strictly control. 1, the material checks first depends on whether it is regular manufacturers of regular products at least have to be able to find the official website on the Internet. The PP-R pipes that are more common in the waterways now have more brands, and the owners choose to renovate them...

2012-03-14 12:01:39
How to check the hidden project

The end of the new home decoration, first of all, to do a good job after the quality of acceptance inspection. This mainly includes the acceptance of "hidden projects", carpentry, paint, metal and some miscellaneous items. Among them, the acceptance of “hidden projects” is particularly important, because complaints caused by “concealed projects” account for a large proportion. Because the “hidden project” cannot be seen invisible, the quality of the project is large and the supervision of the construction process is difficult. Some irresponsible construction teams often turn "hidden projects" into "...

2012-03-14 12:02:32
Hidden Engineering - PPR Pipe Installation and Construction Instructions

Hidden project water supply - PPR pipe installation and construction specification

2009-08-26 13:56:49
Hidden Project Complaints Many Experts Reveal Secrets of Hydropower Reform

Hidden Project Complaints Many Experts Reveal Secrets of Hydropower Reform

2009-11-04 15:41:08
Hidden project into hidden engineering acceptance should be third-party supervision to "gate"

To mention the decoration, people often pay attention to the "face engineering" such as space layout and design style, and ignore the "lid project" of the decoration, which is what is usually called the "hidden project." In fact, the quality of hidden projects directly affects people's daily lives. According to Wang Weisen, Secretary-General of Huizhou Decoration Industry Association, recently, in the complaint regarding the quality of decoration, disputes caused by covert projects accounted for a large proportion.

2011-08-18 09:22:25
There have been 0 comments


submit

Recommended Area Popular Atlas Popular Information Popular Questions and Answers Hot Products
Sofa Bed Brand Living Room Cloth Sofa Decoration Design Single Sofa Bed Cloth Sofa Study Sofa Bed Function Sofa Function Sofa Bed Multifunctional Sofa Bed Function Sofa Small Size Multifunctional Sofa Bed Multifunctional Sofa Functional Sofa Cloth Sofa Sofa Sofa Cabinet Timson Cabinet Price Pvc plastic floor price gold medal overall cabinet stainless steel countertop clean kitchen ceiling construction letter cabinet quality Totem Pojia cabinet side too cabinet price solid wood flooring brand rankings outside the wall size home improvement construction process cabinet countertops quartz stone price balcony window size bed placement direction air conditioning Selection Guide Why Air Conditioning Does Not Cool Wood Flooring Brand Ranking Shopping Mall Bathroom Size Art Glass Pattern Art Furniture Picture Sliding Door Wardrobe Effect Picture Sliding Door Wardrobe Picture Sliding Door Effect Picture Sliding Door Picture Swimming Pool Picture Bathtub Faucet Picture Bathtub Shower Faucet Picture House Decoration European Style Living Room Decoration European Style European Style Villa European Style House Decoration European Style Home Improvement Villa European Style Decoration Case European Style Sofa Villa Decoration European Style Home Decoration European Style Formaldehyde Poisoning Symptoms Foyer Decoration & Fengshui addition Formaldehyde Water heaters, water purifiers effective method for ranking which brand is good water purifier which brand is good air heater kitchen renovation shower room air purifier prices overall price Stairs Stairs telescopic racks racks hanging pole blinds price price price screens screens brand

LED COB Recessed Spotlight

led strip lights ,custom led signs,light fixtures,landscape lighting

HSONG LIGHTING CO,. LTD , https://www.hsonglighting.com