Decoration Company Decoration Company Home Decoration The elevator shaft is the space for elevator operation, which is composed of shaft wall, bottom plate and top plate. The size of the elevator shaft is determined according to the elevator model selection. The shaft wall is installed with elevator rails and counterweight rails, and the reserved door opening is installed with elevator doors. There is an elevator machine room at the top of the hoistway. China Elevator Shaft Components,Elevator System Components manufacturers, welcome Elevator Shaft,Lift Shaft Components purchasers from worldwide to visit our site. Elevator Shaft Components,Elevator System Components,Elevator Shaft,Lift Shaft Components Suzhou Stable Trade Co., Ltd , https://www.stable-elevator.com
2. The acceptance personnel specified in the contract must be present at the time of material acceptance. Whether it is the person in the home improvement industry or the consumer, it seems that the contract has not risen to the legal point of view. However, the home improvement contract itself is a legal document and it may cause unnecessary trouble if it is not taken seriously. Take the material acceptance as an example: In the relevant chapters of the home-installed contract, the author once suggested that the material acceptance should be clearly defined by the acceptance person. However, in actual operation, parties A and B of the contract often do not take seriously the material acceptors specified in the contract. It may be that the acceptance person specified in the acceptance inspection is not present (the acceptance person has not authorized the acceptance person as contracted). Maybe the acceptance person is on the scene but he has no responsibility for acceptance. Strictly speaking, there are legal loopholes in doing so. 3, the acceptance procedure must be strictly accepted. Every material agreement stipulated in the contract should be checked as necessary, such as material quality, material specification, and material quantity. 4. The inspector specified in the contract shall sign on the acceptance form. If the inspection result material is qualified, the inspector shall sign the material acceptance form. This is a more complete process. Because the author encountered such a thing, the owner accepted the material when the material came in, but did not perform necessary procedures at that time. Afterwards, the owner repented, and he refused to accept the results of his acceptance. However, since the other party has no evidence in hand, there is no way to do so. Tip: This section is actually the author to remind the decoration company, because there are many confused decoration companies in this regard. In the end, there are more decoration companies that suffer.
Indoor decoration material acceptance must pay attention
1. Inform the contracting party of the material acceptance time of the other party. After the material is procured, the purchaser needs to notify the other party of the contract to prepare for acceptance of the material. And this acceptance is best arranged as soon as the material comes into play. Therefore, the agreed acceptance time is very necessary. In order to prevent material from entering the market, the other party does not have time to accept the material and affect the construction progress.