First, preparation before use In order to ensure the use of safety, and the machine is in a good working condition, before use, should be performed before the appearance of performance inspection. The inspection is as follows: Second, the steps Third, the use of knowledge Fourth, safety instructions Company website gs 999.com   Pen painting is a kind of painting made by filling or dipping ink with ordinary pens or special metal pens. It is a line art and belongs to an independent painting category. By controlling the speed and strength of the pen grip, you can draw lines of different thicknesses. Pen and ink painting has a unique aesthetic feeling and is very interesting. It is characterized by the decisive use of the pen, the strong and smooth lines, the strong contrast between black and white, and the fine and compact picture effect. It can not only depict the painted things in detail, but also make a high degree of artistic generalization. Portrait, still life, landscape and other themes can be expressed. Pen Drawing,Art Pen Drawing,Fountain Pen Drawing,Pen Drawing Art The universe in the stone is great , https://www.zdsarts.com
a. Whether the power cord is in good condition;
b. Whether each button is valid;
c. Whether oil pipelines leak oil;
d. Whether the nut at each intersection on the jib is fastened.
a. Hold the expenditure leg, adjust the leg bolts, keep the lifting platform horizontal, and then lock the leg positioning bolt;
b. Turn on the power and turn on the power until the light is on.
a. Work according to the specified load, strictly prohibit overloading, and do not overload 10% in special emergency situations;
b. Manned work is forbidden on fixed lift tables without safety barriers;
c. The lifting platform shall not be moved during the operation and in the ascending position;
d. When the elevator platform is working, it must support the expenditure of the leg. It is forbidden to make violent artificial shaking on the working platform.
e. It is forbidden to carry out any electrified work on the worktable;
f. When the working pressure of the lifting platform is found to be too high or the sound is abnormal, it shall be stopped and checked immediately to avoid serious damage to the lifting platform. For general faults, please refer to (faults and exclusions);
g. When the wind power is less than 5, the machine must not be used during thunderstorms.
a. Non-electrical professionals are not allowed to disassemble and disassemble electrical appliances at will to prevent electric shock or misconnection.
b. When it is necessary to enter the lifting table underneath the working platform for maintenance, the lifting platform working platform must be suspended. To prevent the sudden drop of the platform, causing casualties;
c. Non-professionals shall not adjust the overflow valve arbitrarily. When each component in the hydraulic system is working under the specified pressure, any adjustment of the overflow valve may cause the hydraulic system to operate abnormally. There will be unnecessary damage to people, machines, and objects;
d. Before any part of the hydraulic system is unloaded, the pressure must be relieved first to prevent the pressure oil from escaping, and the worktable suddenly falls;
e. Add some lubricating oil between the corresponding moving parts to prolong the service life of the bearings;
f. Check the oil quality and oil level of hydraulic oil. Lift platform rises all the way. In this position, the hydraulic fluid level should be 40-50 mm above the bottom of the tank. If the hydraulic machine is darkened, sticky or has foreign matter such as grit, replace it with 120# hydraulic oil if found.