The perfect decoration of the whole knowledge Raiders summary of experience, read these, and hope to bring more convenience and comfort to your home life. Bai Ruijia curtains Yaxing cloth industry home sofa 1, do not do the head of the shoe partition, leave a little space so that the gray shoes can leak to the bottom, installed above the sink and gas stove lights. When determining the location of a bathroom floor drain, you must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point regardless of how the brick is inclined. 2, bathroom, air conditioning socket are not designed switch. Especially bathroom electric water heaters, with a two-stage switch with a plug is appropriate. If you want to turn off the electric heat, it is dangerous to pull the plug 3, on the face of the brick corner of the treatment method, in the final analysis is to see the level of workers. If the masonry workers are in good condition and the tools for grinding tiles are good, they should not hesitate to grind the 45-degree angle. From the effect point of view, as long as the grinding is good, the practice of grinding the angle of 45 degrees is the most beautiful! If the worker's level is really not good, then you still have to choose to use an angle strip, because the bad 45-degree angle grinding method is not as good as the effect of the Yang-angle strip. 4. It is also very important to test the water pressure after the water pipes are arranged. During the test, everyone must be present, and the test time should be at least 30 minutes. The conditions are permissible, preferably one hour. Ten kilograms of pressurization, and finally there is no reduction to pass the test. 5, plastic steel doors must be considered when the size of the plastic steel door frame protruding wall, informed the installation staff, making the final door frame and finished tile wall is flat, so both beautiful and good hygiene. 6, the carpentry door package and the mason's tiling is also to match, when the package door, we must consider the following ground (door on both sides of the ground on either side) whether it is still tile or other cement mortar leveling thing, Because the door covers are nailed to the floor if they are nailed before applying the tiles, if the cement and the door cover are stained when cement is used in the future, it will cause the door cover to be watery and moldy. 7, the mattress and the bed board must be breathable. Bed board is generally best with fir board 8, do paint as much as possible with paper tape 9, buy lamps and lanterns should pay attention to: Generally try to use glass, stainless steel, copper or wooden shelves), generally do not buy what iron plating above what other plating ah, what paint ah and the like, easy to fade. 10, basins try to use ceramic basins, glass basins are difficult to engage in health 11, hydropower reform to their own plans, asking them to open the line according to Cao. They looked at their lines and pressed Cao's lines. Each item must be checked and accepted. 12, waterproof must be done, we must test the water! 13, many of the construction of the verbal agreement has become a gap in the checkout, must be written in black and white, the increase and decrease of the project must be sure to ask the price, write it out! 14. If the ground is installed on the ground, the ground must be re-doed to re-level the cement layer. 15, the kitchen door, or to decorate the carpenter to do wooden hanging rails as well. 16, the living room as much as possible to install the power plug. 17, outside the bathroom shower or partition. It is not practical to pull a shower curtain. It is practically inconvenient and the water flows across the floor. 18, to do the material of the door and door frame to choose the fine materials of wood. Links: Checkpoints for Acceptance of Blank Room Wall Structure Construction Acceptance Cement Paint Glass Switch Air Conditioning Price Kitchen Door Decoration Living Room Decoration Cutout Cloth Sofa Glass Tile Kitchen Door Partition Cabinet Floor Tile Door Partition Door Glass Door Kitchen Glass Sliding Door Bathroom Tile Bathroom Door Bathroom Door Size Bathroom Waterproof Price Toilet Size Toilet Partition Toilet Design Bathroom waterproof tile adhesive tile price floor tile kitchen tile Abs Measure Tape,Best Tape Measure,Engineers Tape Measure,Tape Measure Measurements HENAN SHIJI HUALIAN TOOLS AND MEASURE CO.,LTD , https://www.hnsjhl.com